6. ASSEMBLY
RH-9820
102
A Turn the feed base (a) upside down. Place the
four retaining rings C (1) onto one side of the
four ball bearings (2), then apply adhesive
(Threebond 1373B) to the four ball bearings
(2) and then insert them into the four holes (b).
* Wipe away any excess adhesive at this
time.
* Install so that the layout of the balls (c) is in
an “X” pattern on the installation surface as
shown in the illustration.
B Place the retaining rings C (4) onto one side of
the ball bearing (5), then apply adhesive
(Threebond 1373B) to the ball bearing (5) and
then insert it into the Y bearing (7).
* Wipe away any excess adhesive at this
time.
* Install so that the layout of the balls (d) is in
an “X” pattern on the installation surface as
shown in the illustration.
C Assemble as shown in the illustration.
D Assemble as shown in the illustration.
E Assemble as shown in the illustration.
F Assemble as shown in the illustration.
0995B
0990B
0991B
0997B
0994B
0996B
(When at maximum retraction)
(When at maximum retraction)
(When at maximum retraction)
(最縮時)
0992B
0993B
Installation
surface
Installation
surface
Comments to this Manuals