Brother BAS-342G Instruction Manual Page 18

  • Download
  • Add to my manuals
  • Print
  • Page
    / 84
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 17
4. INSTALLATION
9
BAS-342G
4-7. Installing the operation panel [3]
(1) Cushion A
(2) Operation panel base
(3) Plain washers (medium) [3 pcs.]
(4) Bolts [3 pcs.]
(5) Cushions B [3 pcs.]
(6) Plain washers (large) [3 pcs.]
(7) Nuts [6 pcs.]
* Tighten until the thickness of
cushion B (5) is about 1 mm.
(8) Rubber seat
(9) Operation panel stand
(10) Operation panel
* Pass the cords of the operation
panel (10) through the operation
panel stand (9) and under the
table.
(11) Bolts [3 pcs.]
(12) Bolt
< If the sewing machine was already installed to the table when it was delivered >
(1) Operation panel
(2) Bolts [3 pcs.]
* Pass the cords of the operation
panel (1) through the operation
panel stand (3) and under the
table.
3970
3971
M
Page view 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 83 84

Comments to this Manuals

No comments